Top Back to top

JACIE Certified Centres

This page features two lists. The first list shows all of the centres with valid certification (valid meaning not yet expired). The second list shows those centres that have formally requested certification and who are at some stage of the process. This includes having applied, awaiting inspection, inspected awaiting report, or in the corrections phase. This list makes no assessment of the centres' compliance with the Standards. Both lists are updated on a monthly basis. 

JACIE Report of Certified Centers: Please note that as part of the response to the COVID19 pandemic, an extension was awarded as a once-off or unique measure to all those centres whose certification was still valid after 31 March 2020. This extension is already incorporated into the Certification time periods shown in the Report. Certification awards issued after 1 April 2020 reverted to the standard 4-year period.

JACIE Report of Centres in process: Those centres are listed as "In Process" in a separate list from the Certified centres. This is referred to as "coverage", a term limited to acknowledging that a given centre is in the certification process without having achieved certification. A letter stating their current status can be requested from the JACIE office by the centre by writing to jacie@ebmt.org  

Please note that this is how the different Stages reflected in the list of Centres In Process relate to the different phases of the Certification process: 

StagePhase
01 Initial registration (new, unapproved)Pre-inspection phase. JACIE/Centre are reviewing the Application for Certification
02 Document Checklist (new, approved)Pre-inspection phase. Centre is preparing the submission of Pre-audit documentation
03 InspectionInspection phase. Centre is awaiting or going through the Inspection
04 Post-inspection (awaiting inspection report)Post-inspection phase. Inspectors are working on the Inspection Report
05  Preparing Summary ReportPost-inspection phase. JACIE Office is working on the Inspection Report
06 With Certification CommitteePost-inspection phase. The Report is ready to be discussed/being discussed by the Certification Commtitee
07 In process (not certified)Post-inspection phase. The Centre is working on the Evidence of Corrections
08 Assessment of correctionsPost-inspection phase. Centre has submitted Evidence of corrections and these are being reviewed

See also the additional guidance under the FAQs section.

In the event that a centre does not appear on either list, please contact the JACIE Office at jacie@ebmt.org for more information or telephone +34 93 453 8570.